ADU Ledger

How big can a Fort Collins ADU be?

✓ Verified against code · August 19, 2026

For a new detached unit: 750 sq ft if your home is under 1,667 sq ft, otherwise the lesser of 1,000 sq ft or 45% of the home. Converting an existing outbuilding allows 800 sq ft, and basement ADUs can take the whole floor.

Citation: LUC §3.1.8

How current is this?

Fort Collins’s ADU rules run under Land Use Code §3.1.8 and zone-district standards (Ordinance 009-2025). After the 2022–23 land-use-code repeal saga, Fort Collins re-adopted its code in May 2024 and rewrote the ADU rules for state compliance effective February 14, 2025 (Ordinance 009-2025). The rules are clean and generous; the fees are the story — expect $20,000–25,000 all-in before construction. We verified this answer against primary sources on August 19, 2026, and every change we catch is logged in the changelog.

More Fort Collins ADU questions

All Fort Collins ADU rules → · Compare Colorado cities →

Not legal advice — lot-specific overlays can change the answer for your parcel. The citation above points at the governing code section; check it, or ask the city to confirm.