How long does an Arvada ADU permit take?

✓ Verified against code · August 19, 2026

The city publishes targets: about 3 weeks of review for a detached ADU, 1–2 weeks for an interior or attached one — administrative, through the eTRAKiT portal, with a licensed contractor required.

Citation: City ADU page

How current is this?

Arvada’s ADU rules run under Land Development Code §5-1-5-2 (2022 LDC (Ord 4793), amended by Ord 4905). Arvada's ADU framework dates to its 2022 code and was amended in August 2025 — after the state deadline — without fixing the provisions that appear to conflict with Colorado's ADU statute: ongoing owner-occupancy with a deed restriction, a blanket parking mandate, and size caps that dip below the statute's protected range. The state's October 2025 compliance review listed Arvada among the non-complying jurisdictions. We verified this answer against primary sources on August 19, 2026, and every change we catch is logged in the changelog.

More Arvada ADU questions

All Arvada ADU rules → · Compare Colorado cities →

Not legal advice — lot-specific overlays can change the answer for your parcel. The citation above points at the governing code section; check it, or ask the city to confirm.